Master Plan
2025 Housing Element and Fair Share Plan
The Township of Cherry Hill adopted the Binding Resolution Committing to Present and Prospective Need on January 27, 2025 and published it on the website on January 28, 2025 . The resolution is also attached to a declaratory relief lawsuit that was filed on January 28, 2025. The Cherry Hill Township Planning Board adopted the Township's Housing Element and Fair Share Plan on June 16, 2025. The document serves as a blueprint for how a municipality will address its fair share of affordable housing. It provides an overview of local demographics, housing, and employment conditions, identifies the municipal affordable housing obligation, and establishes the mechanisms that will allow opportunities for affordable housing within the community. Township Council endorsed the Housing Element and Fair Share Plan by Resolution on June 23, 2025.
2025 Open Space & Recreation Plan
2018 Master Plan
The Master Plan is a document created to guide Cherry Hill Township in establishing land uses in the long-term future. It is based on analysis of physical features, socioeconomic data, and emerging trends within the Township. It establishes goals and policies for future development, while setting forth recommendations to guide planning decisions that will achieve a desired relationship among future land uses. These recommendations will result in future land use patterns, which promote the best possible living and working conditions for present and future residents. Learn more about the 2018 Master Plan by clicking on the Link in the Side Bar
Final Documents
Executive Summary (PDF)
1. Chapter 1: Introduction (PDF)
2. Chapter 2: Demographics (PDF)
3. Chapter 3: Public Outreach PDF)
4. Chapter 4: Policy Consistency (PDF)
5. Chapter 5: Vision & Goals (PDF)
6. Chapter 6: Land Use Plan Element (PDF)
7. Chapter 7: Economic Development Plan Element (PDF)
8. Chapter 8: Plans For Place Subplan Element (PDF)
9. Appendix A: Existing Conditions Report (PDF)
10. Appendix B: Public Outreach Report (PDF)
11. Appendix C: 2007 Master Plan Reexamination Report (PDF)
Additional Planning Documents
Master Plan 2003
- Preface: Cover and Contents (PDF)
- Community Vision Statement and Introduction (PDF)
- Land Use A (PDF)
- Land Use B (PDF)
- Circulation (PDF)
- Recreation (PDF)
- Open Space Conservation and Natural Resources (PDF)
- Housing and Population (PD)
- Community Facilities (PDF)
- Utilities and Recycling (PDF)
- Economic (PDF)
- Historic Preservation (PDF)
- Implementation (PDF)
Re-examination Report 2007
Re-examination Maps & Documents
- Regional Context (PDF)
- Population Density (PDF)
- Topography (PDF)
- Watersheds (PDF)
- Open Space (PDF)
- Conservation Overlay (PDF)
- Roadway Network (PDF)
- Traffic Calming (PDF)
- Existing Land Use 2003 (PDF)
- Existing Zoning (PDF)
- Zoning Map Changes (PDF)
- Zoning Map 2007 (PDF)
Housing Element & Fair Share Plan 2011
Housing Element & Fair Share Plan Amendment 2014
Housing Element & Fair Share Plan 2015
Amended Third Round Housing Element & Fair Share Plan 2016
Bicycle & Pedestrian Master Plan
Complete Streets
Sustainability Plan
Redevelopment Plans
- Victory Refrigeration Redevelopment Plan (PDF)
- Woodcrest Station Transit Oriented Development (TOD) Plan
- Hampton Road Redevelopment Plan (PDF)
- Cuthbert Boulevard Gateway: Baker Lanes Redevelopment Plan (PDF)
- Park Boulevard Redevelopment Plan (PDF)
- Amended Kennedy Hospital Redevelopment Plan (PDF)
- Langston Steel Redevelopment Plan (PDF)
- Route 38 (Redevelopment Area No. 2) (PDF)
- I-295 (Redevelopment Area No. 3) (PDF)
- Route 70 Western Gateway Phase I (Redevelopment Area No. 4) (PDF)
- Route 70 Western Gateway Phase II (Redevelopment Area No. 5) (PDF)
- Golden Circle Redevelopment Plan (PDF)
- Cherry Hill Apartments Redevelopment Plan (PDF)
- Erlton Streetscape Plan (PDF)
- Haddonfield Road Study (PDF)
- South Birchwood Park Traffic Calming Plan (PDF)